Proforma Invoice From a Chinese Supplier: 18 Things to Check Before You Pay the Deposit (UAE and Saudi Importers)

Short answer
A proforma invoice (PI) is the supplier's formal quotation and order confirmation: it lists what you are buying, at what price, under which Incoterm, with which payment terms and lead time, and it is usually what you pay the deposit against. Because many Chinese suppliers treat the PI as the deal, anything missing from it is hard to claim later. Before you pay, check that product specifications match your approved sample, quantities and unit prices add up, the Incoterm and port are correct, payment terms and bank details match the verified company, lead time and packing are stated, and quality, inspection and defect terms are written in. Husbar China Line helps UAE and Saudi importers source, check and inspect orders.
Key takeaways
- ✓The PI is often treated as the contract: if it is not on the PI, assume it is not agreed.
- ✓Match specs to the approved sample, not to chat messages.
- ✓Check Incoterm, port, bank account name and lead time carefully.
- ✓Add inspection, defect and delay terms before paying the deposit.
PI vs purchase order vs commercial invoice
| Document | Who issues it | When | Purpose |
|---|---|---|---|
| Proforma invoice (PI) | Supplier | Before production | Quotation and order confirmation; basis for the deposit |
| Purchase order (PO) | Buyer | Before or with the PI | Your formal order with your terms |
| Commercial invoice | Supplier | At shipment | Final bill used for customs clearance |
| Packing list | Supplier | At shipment | Cartons, weights, dimensions, contents |
| Bill of lading or air waybill | Carrier or forwarder | At shipment | Shipping contract and receipt of goods |
Why proforma invoices cause so many problems
Specs written too loosely
A PI that says "bag, black, PU leather" leaves the factory free to change thickness, lining, hardware or stitching. Detailed specs, or a reference to the signed approved sample and tech pack, are your protection.
Incoterm confusion
FOB Shenzhen, EXW factory and CIF Jebel Ali mean very different costs and risks. Importers who misunderstand the Incoterm get surprise charges for local trucking, export clearance or destination fees.
Payment and bank detail risk
Payment fraud often starts with bank details that do not match the supplier's company name. The account holder on the PI should match the verified business licence, and any change should be confirmed by phone through a known contact.
No consequences for delays or defects
If the PI says nothing about late delivery or defects, you have little leverage. Simple clauses on inspection before balance payment and remedies for defects change behaviour.
How to check a PI step by step
- Compare the supplier name, address and company stamp with their business licence and your verification report.
- Check every product line: model number, materials, colours, sizes, finish, accessories, against the approved sample.
- Check quantities, unit prices, currency and the total; recalculate yourself.
- Confirm the Incoterm (EXW, FOB, CIF, DDP) and the named port or place.
- Check payment terms: deposit percentage, balance timing (before shipment, against copy of bill of lading) and method.
- Check the beneficiary bank account name matches the company; confirm by phone if anything differs.
- Check the stated production lead time and what starts the clock (deposit received, sample approved).
- Check packing: carton type, units per carton, labels, barcodes, shipping marks, Arabic labelling if needed.
- Add inspection and defect terms, then sign and return only the final version.
Want your product made, inspected and delivered without the risk?
Husbar China Line verifies factories, negotiates for you, arranges on-site inspection before you pay the balance, and manages freight to the UAE, Saudi Arabia and beyond.
Request a China Line consultationThe treasure: the 18-point PI checklist and clauses to add
- 1. Supplier legal name matches business licence. 2. Supplier address and contact. 3. PI number and date. 4. Validity date of prices.
- 5. Product code and description for each line. 6. Materials, colours, sizes, finishes. 7. Reference to approved sample or tech pack. 8. Accessories and packaging per unit.
- 9. Quantity per line and total. 10. Unit price, currency and total amount. 11. Incoterm and named place, for example FOB Ningbo. 12. Payment terms and schedule.
- 13. Beneficiary bank name, account name and number. 14. Production lead time and start trigger. 15. Packing, labelling and shipping marks. 16. HS code suggestion and documents to be provided (commercial invoice, packing list, certificate of origin if needed).
- 17. Quality and inspection: "Balance payment is due after a pre-shipment inspection by the buyer's inspector confirms the goods match the approved sample." 18. Remedies: "Defective goods found at inspection will be reworked or replaced at the supplier's cost before shipment."
- Delay clause to propose: "If shipment is later than [date] for reasons within the supplier's control, the buyer may request a discount of [X]% per week or cancel the unproduced balance."
- Bank change clause: "Any change to bank details must be confirmed by a phone call from the buyer to a known contact. Payments to accounts not named on this PI will not be made."
- Copy-paste message to the supplier: "Before we pay the deposit, please update the PI with the approved sample reference, packing details, inspection before balance payment and the bank account in your company's registered name."
A worked example
Picture a Sharjah trading company ordering kitchen storage products from a Guangdong factory. The first PI listed the products by short names, FOB with no port, and a bank account under a different company name. Before paying, the team asked for the approved sample reference, materials and carton details on each line, the port named, inspection before balance payment and an explanation of the bank account. The supplier corrected the account to its registered company name and added the terms. At pre-shipment inspection, a carton labelling issue was found and fixed before shipping, instead of after arrival.
Want Husbar to do this for you?
Husbar China Line can verify your supplier, check the PI and contract, approve samples, inspect production and coordinate shipping to the UAE or Saudi Arabia. Book a free Growth Audit or a free Google Meet consultation on our contact page.
Saudi importers: extra checks
Goods going to Saudi Arabia may need product conformity certificates through the SABER platform and specific labelling. Ask the supplier early which certificates and test reports they can provide, and list them on the PI so certification work is part of the agreed order rather than a surprise after production.
Keeping one source of truth
Orders go wrong when terms live in WeChat, WhatsApp, email and the PI at the same time. Agree that the signed PI and PO are the only valid terms, attach the approved sample photos and tech pack, and send an updated PI version for every change. Your team and the factory then work from the same document.
Planning around Chinese New Year
Lead times on a PI can be meaningless if production runs into the Chinese New Year factory shutdown. For orders placed in late autumn and winter, ask the factory to confirm the shutdown dates, when workers return and whether the stated lead time already includes the break.
How Husbar helps
Husbar China Line helps UAE and Saudi importers find and verify factories, negotiate terms, check PIs and contracts, approve samples, run inspections and coordinate shipping, so you pay for exactly what you approved. Our China Line sourcing service (see the factory-to-door journey in 3D) can take this on end to end, or support your team. book a free Growth Audit.
Questions to ask before you start
- Has this supplier been verified, and does the PI match the business licence?
- Is every product line tied to an approved sample?
- Which Incoterm do we actually want, and why?
- When is the balance paid, and what must happen first?
- What happens if the order is late or defective?
Key terms
- Proforma invoice (PI): a supplier's preliminary invoice confirming the order terms.
- Incoterms: ICC rules defining costs and risks between buyer and seller.
- Deposit: the advance payment before production.
- Pre-shipment inspection: a quality check before goods leave the factory.
- Shipping marks: labels on cartons that identify the shipment.
Mistakes to avoid
- Paying against a PI with vague specs.
- Ignoring the Incoterm and port.
- Paying to an account in a different name without checks.
- Paying the full balance before inspection.
- Agreeing changes on chat without updating the PI.
Why quality control is built into every order
Most problems with overseas manufacturing come from unclear specifications, skipped samples or no inspection before shipping. A sourcing partner on the ground in China checks factories, approves samples, inspects production and coordinates shipping, so issues are fixed before goods leave the factory rather than after they arrive.
Related reading: purchase order template for Chinese suppliers, safe payment terms with Chinese suppliers, supplier changed bank details: how to spot fraud and quality control inspection and AQL.
What is a proforma invoice from a Chinese supplier?+
It is a preliminary invoice that confirms products, prices, Incoterm, payment terms and lead time. Buyers usually pay the deposit against it.
Is a proforma invoice a contract?+
It is often treated as the agreed order once both sides accept it. For larger orders, use a purchase order or contract as well, and make sure the PI matches it.
What payment terms are common on Chinese PIs?+
A deposit before production and a balance before shipment are common. Try to link the balance to a passed pre-shipment inspection.
Can I use a proforma invoice for UAE customs?+
Customs clearance normally relies on the commercial invoice and other shipping documents. Check current requirements with your forwarder and Dubai Customs.
What if the bank account on the PI is personal?+
Treat it as a red flag. Ask why, verify through a known contact, and prefer paying the registered company account.
How does Husbar China Line work?+
We source and verify factories, manage samples and specifications, inspect production and coordinate shipping to the UAE and Saudi Arabia.
What is the minimum order Husbar can help with?+
It depends on the product and factory; we can advise on low-MOQ options for smaller brands.
Sources
- [International Trade Administration (trade.gov): pro forma invoice](https://trade.gov/pro-forma-invoice)
- [International Trade Administration (trade.gov): commercial invoice](https://www.trade.gov/commercial-invoice)
- [ICC: Incoterms rules](https://iccwbo.org/business-solutions/incoterms-rules/)
- [Dubai Customs](https://www.dubaicustoms.gov.ae/en/)
- [Dubai Municipality: guidelines for consumer products import and re-export](https://dmpmedia.dm.gov.ae/uploads/2025/05/DM-HSD-GU100-CPIE2_Guidelines-for-Consumer-Products-Import-and-Re-export-V.2.pdf)
Team Husbar
Husbar Editorial
Team Husbar is the strategy, psychology and research team at Husbar, a psychology-led growth agency headquartered in Dubai. Together we have worked with 100+ brands over 10+ years.
Want your product made, inspected and delivered without the risk?
Husbar China Line verifies factories, negotiates for you, arranges on-site inspection before you pay the balance, and manages freight to the UAE, Saudi Arabia and beyond.
Request a China Line consultationKeep reading

